View Single Post
Old 06-03-2023, 04:10 AM   #4727
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Every Stoney/Henday leg has had an October 1st opening date so it's a fairly safe bet it will be that as well for everything 2024.

Quote:
Originally Posted by calgarygeologist View Post
The one part that disappoints me about the new TCH/Stoney interchange is that westbound TCH just before Valley Ridge bottlenecks down to two lanes from three. I'm not really sure why they designed it that way but it seems really stupid.
I'm pretty sure this is a limitation in the Highway Design Guide preventing 3 lane + 3 lane merges... AB Trans really doesn't like to go 6 lanes wide if they can help it. When we see 3 down to 2 as Calgarians were forgiven for immediately thinking of the Deerfoot abominations at Glenmore and Bow Bottom but based on volumes I don't really see this being a catastrophic bottleneck, traffic is only about 13,000 vehicles per day and westbound traffic going through the interchange this will go down with the west leg open as the NB-WB flyover takes over some of the load.

For comparison, at Glenmore, Deerfoot carries about 40,000 each way as it crunches from 3 to 2.


Quote:
Originally Posted by Lubicon View Post
Not as long as it's taking to do the one on the West Stoney project.
To be fair, that one is very complicated and has run into some issues, not the least of which are dumb environmental stuff... restrictions they didn't have to deal with building the identical one next to it.

As for the one down on 22X - no idea what's taking so long... but there's no real incentive for the project to be dragged out as long as humanly possible. Of that I'm sure.
Acey is offline   Reply With Quote
The Following User Says Thank You to Acey For This Useful Post: