Quote:
Originally Posted by underGRADFlame
I have the Level 2 already, just haven't run the electrical yet (as I need a DCC12). I've managed for 16 months on a level 1 at home but I think now with the PHEV I'll get it done before winter to be safe. At minimum I want a new dedicated circuit for the 2nd 120v as, the breaker won't take 2 charges for sure.
|
Gotcha. Missed that you already had one and that this was a second.
__________________
THE SHANTZ WILL RISE AGAIN.

<-----Check the Badge bitches. You want some Awesome, you come to me!