Quote:
Originally Posted by timun
The number that had been bandied about for years was $400M. Council was told it was from a 2014 report. The CBC FOIPed the report and it turned out... it didn't exist. The $400M was just an internal Calgary Transit estimate. https://www.cbc.ca/news/canada/calga...gary-1.6504818
There are 45 stations, so $200M / 45 = $4.44M per. The mythical $400M figure obviously works out to $8.89 per station.
|
Wow. That's nuts.
__________________
"If stupidity got us into this mess, then why can't it get us out?"
|