Quote:
Originally Posted by calgarygeologist
I'm not sure if that is correct. Remington land is north of 11 Ave to the CPR lines. Between 11 Ave and 12 Ave east of 4 Street is land that I believe belongs to the Stampede but the building have not been flattened yet and are still in use.
|
Epilogue, 8 years after this post. It looks like CPR broke a contract to sell the land to Remington and now owes them $163 million. And the province is "liable to Remington for inducing the breach of contract".
https://calgaryherald.com/business/c...n-on-cpr-lands