Quote:
Originally Posted by automaton 3
min 6" at the footings...but I believe the pad itself can be 4"
|
In the middle of the PDF from the city's website:
150 mm (min) Concrete Slab
150 mm (min) Compacted Gravel
Yeah, I was thinking 4 inches was going to be enough. Then all of a sudden I was told I had to have at least 6 inches.
Que Fotze's responce in 3....2....1.....