Quote:
Originally Posted by Bigtime
City briefing underway right now, they are still watching for that rain coming on Sunday-Monday to possibly raise flow rates. They are going to open up a couple of lanes on Memorial with a temporary opening in the berm.
Berm cost was $115,000 and protecting ~$53M in property.
Thread from a journo here:
https://twitter.com/user/status/1537447782927040517
|
They should leave the berm in place and open the lanes to 4x4 traffic only.