Quote:
Originally Posted by Enoch Root
I agree with your point, but that sounds high. I installed a new, dedicated 100A panel in my garage, along with the 14-50 plug, and the total was about $2,500. The plug alone was only like $350, or something around there.
And there is a $1,500 rebate available if you do it.
|
$2500 sounds like a hell of a deal today for a 100A panel. The guy at work just showed me the estimate as it involves drilling through the foundation from the main panel and running tech cable all around the house, under the deck and into the garage as well as the power management system for the 50A circuit and Tesla wall charger installed at $3700 plus tax. No mention of a rebate.