Quote:
Originally Posted by Ryan Coke
Apparently there was bridge work going on that had that road closed a few km past the gate. Last I heard is it was still going on, and bikes couldn’t pass. Unless there has been a recent change that I haven’t heard about.
It is too bad, that is a good ride though (though the 1A is still better IMO).
|
I know someone who rode down there last weekend and the bridge construction was about 10km in, still ongoing