Quote:
Originally Posted by You Need a Thneed
If anyone thinks that the “pause” was caused by anything other than massively increasing construction costs, give your head a shake.
The mutually agreed deal had the city capped below $300 million, and it was probably looking like C-SECTION was going to have to put in an additional $100-$150 million themselves over what was budgeted for.
|
You mean it wasn’t for spite because the Mayor tweeted?