I was looking at a custom road bike order, a shimano build was about 240 days, a SRAM build was 450+. I love the plus there, pretty much a who knows when, but something longer then 15 months.
The shimano build I ordered ended up slightly better than originally forecast, about 7 months, but it’ll arrive after most of the summer is done.
|