Quote:
Originally Posted by powderjunkie
From N to S:
New 9 Ave bridge
Temp 9 ave bridge
Existing CP rail bridge
Mystery bridge immediately south of that - are they adding/replacing the CP rail bridge?
It would be a real shame if they've built three bridges over the same stretch of water and couldn't find a way to build the fourth at the same time...
|
CP Rail built a new bridge right next to their old one (two more tracks) - the Green Line bridge will be south of that one.