Reading between the lines, the GM seems to acknowledge that there was likely some reasonable confusion about the roadway/sidewalk costs - perhaps related to the changeover from CMLC as lead.
But, the city agreed to take on the 6.4M for roads, leaving 5.7M for sidewalks as the only real possible issue here
|