Quote:
Originally Posted by powderjunkie
Interesting link. I find it hard to fathom why it would be that expensive. Presumably the expectation has been a blue-line spur line to the east, but Airport Trail to the west is new enough that a ROW was also accounted for.
|
The plan is a shuttle train that runs from the non-existent green line, to the airport, and to the blue line as well. So straight across, with a T down to the airport. This is several council lifetimes away at this rate, but would be the cheapest way to do it.