Quote:
Originally Posted by BlackArcher101
Probably a good candidate for a bridge, otherwise we'll have this same issue again when material comes down the mountain in another rain event. Leave the naturally occurring debris chute as is and start planning ahead.
|
A bridge takes a long time though, this is the #1 so they need it fixed fast. I'd imagine they drop a big culvert in and add loads of fill, then worry about engineering a proper solution later.