In addition to what I said there, temporary access could be a bumpy narrow gravel road with a 30kmh speed limit. They will want to build a temporary route beside each destroyed bridge, which means something that can be easily removed again later, so they won’t get too fancy.
The problem with highway 1 is that there’s no place to put a temporary road that’s not in the way of trying to do a full repair.
|