On #5 losing the abutment and having the deck fall into the river is a long term rebuild, doubtful you can't reuse that span. That #1 Tank hill bridge is a total loss, even the rail line with the exposed pilings is probably a write off. I don't know if the Army Engineers have some temporary bridge spans, but those might be the only hope for any sort of speedy reopening. Maybe they can source something pre-cast spans from other projects. Things looks incredibly bleak from those photos and the time of year we're in.
|