Quote:
Originally Posted by Lubicon
Hoping they could do most of the cutting along 2nd Street itself and leave the intersections alone, then dig/tunnel that small portion rather than having to rip up the street in it's entirety. Is that possible?
|
I doubt it. Most streets are full of utilities that are all going to need relocating before the tunnel itself. I remember the centre st and 16th ave crossing took an eternity to rebuild because there is so much stuff under there. Unless this street happens to have not much there, I'd expect a long term dig.