Yeah, looking at the technical data for the Urbos 100 model, they are 43m in length, so I bet they will operate in pairs on Green Line, which would be longer than 3 Siemens cars (~25m each). So, 12 consists at peak for the first phase of Green Line should work.
I would guess platforms will be able to accommodate 3 car trains, which would be about the same as 5 car Siemens trains on the rest of the system.
|