Quote:
Originally Posted by Hemi-Cuda
They'll likely have it in some sort of reduced capacity operation within a month or two, shuffling traffic from one side to the other depending on the damage. How long was HWY 1 out at Canmore during the 2013 floods?
|
It took 7 days to re-open Hwy 1 to only two lanes at 60 km/h, with less severe damage, materials more accessible, and not as remote.