Quote:
Originally Posted by Hemi-Cuda
They'll likely have it in some sort of reduced capacity operation within a month or two, shuffling traffic from one side to the other depending on the damage. How long was HWY 1 out at Canmore during the 2013 floods?
|
Canmore was one fairly short stretch, and no bridge structures (if I recall correctly).
This appears to be multiple stretches, and multiple bridge structures gone. Plus, it will be winter, which makes it much more difficult.
The multiple stretches makes it hard to get to certain sections with equipment until you fix other areas first.