View Single Post
Old 09-20-2021, 12:21 PM   #28
getbak
Franchise Player
 
getbak's Avatar
 
Join Date: Feb 2006
Location: Calgary, AB
Exp:
Default

Quote:
Originally Posted by Monahammer View Post
Pepsi, I think that the master plan as mentioned was definitely going to tie in well while CMLC was in charge of all projects. That's no longer the case, and the released renderings show it. E.g. The public venue (pretty pathetically small) outside faces a relatively dead streetscape and loading docks kitty corner.
Everything that has been released so far was done with CMLC's involvement. The project management change didn't happen until after those plans were finalized.

The arena designs only include the two city blocks where the arena will be built because that's all that is included in the arena project. Whatever gets built outside of those two blocks will be done by CMLC as part of the Rivers District.
__________________
Turn up the good, turn down the suck!
getbak is offline   Reply With Quote