To confirm, there are currently no plans to install lights at any of the intersections, let alone all 3. This was referenced in Erick's original post but it might be worth noting again:
https://www.calgary.ca/transportatio...storation.html
Quote:
- Are traffic signals being installed as part of this project?
This project does not include the installation of traffic signals.
Underground infrastructure for potential future traffic signals is being pre-installed at the Brisebois Drive, Charleswood Drive and 19 Street N.W. intersections to reduce future costs and impacts to the traveling public.
Traffic signals will be installed when warranted in the future after a detailed analysis is completed.
|