Quote:
Originally Posted by RichieRich View Post
I recall closer to ~$11 for the CBM gas gathering networks and facilities which I designed and had built including compressor packages through central Alberta. At the time the CBM wells and pipeline systems were based upon ~100-200mscfd per well, but really discharged closer to 50-120'ish . Pretty cool stuff actually... were pulling the pipelines down as low as ~1-3psi (7-20kpa) which was madness IMO. Needless to say the economics were tight even at $7 gas, but were good at $9+ while they lasted.
An extra 50-100 mcf/d is pretty handy for the economics of a shallow gas well you're drilling anyway, or already have though. Especially if you don't frac them, if its just perf and go.

I can see how that would be super boring for a geologist though. I picked cbm perfs once upon a time as young completions engineer. It took the area geo about 5 minutes to confirm I could pick the right coal seam.
bizaro86 is offline   Reply With Quote
The Following User Says Thank You to bizaro86 For This Useful Post: