I'm confused... I thought the interchange at Stoney and Deerfoot was designed as a T because it was going to be a while until the NE leg was finished. Is that out the window now?
The Glenmore to Hwy 1 section will be a long ways off as the interchange they are 80% done at Stoney and 16th is a T for sure. No sign of running the road up the hill yet.
|