View Single Post
Old 11-11-2020, 12:50 PM   #4003
btimbit
Franchise Player
 
btimbit's Avatar
 
Join Date: Sep 2012
Location: St. George's, Grenada
Exp:
Default

Quote:
Originally Posted by vtec260 View Post
Looks like the road paint was re-done recently from Westhill way to Anderson as initial paint must have been like water-based. After the first snow storm and the melt off, most lines became very faint and almost unreadable.
It was probably done when it was cold out, low voc paint never looks good when it's applied this time of year. It'll probably be done again in epoxy in the spring
btimbit is offline   Reply With Quote