View Single Post
Old 10-01-2020, 12:29 PM   #3762
TorqueDog
Franchise Player
 
TorqueDog's Avatar
 
Join Date: Jul 2010
Location: Calgary - Centre West
Exp:
Default

Quote:
Originally Posted by timun View Post
That was part of the planned "Glenmore widening and interchange" project (https://www.calgary.ca/transportatio...-projects.html, https://www.calgary.ca/content/dam/w...all-design.pdf). They finished all the widening of Glenmore itself, rebuilt the noise barrier at WB Glenmore to NB Crowchild, built the new pedestrian bridge at 54th Ave; for some reason the only thing that was planned as part of the project and DIDN'T get done was the double-turn from EB Glenmore to NB Crowchild and two straight-through lanes.

Spoiler!
I was going to ask if that was when they had still planned an interchange at Richard Road, but that PDF suggests that this was after that had been cut.
__________________
-James
GO
FLAMES GO.

Quote:
Originally Posted by Azure
Typical dumb take.
TorqueDog is offline   Reply With Quote