Quote:
Originally Posted by powderjunkie
They’ll probably need to look at EB Glenmore onto NB Crowchild...making it a double left turn with another lane to get into Lakeview?
|
Quote:
Originally Posted by you&me
I don't know about a double left turn from the exit onto NB Crowchild though; I think there's only one through lane onto Crowchild north, with the other lane on the overpass being a dedicated turn lane from Crowchild onto WB Glenmore (Plus Crowchild at that point is two lanes from WB Glenmore > NB Crowchild, which is only 3 lanes, so there isn't room on Crowchild for two more lanes coming from the overpass).
|
This was part of the planned "Glenmore widening and interchange" project (
https://www.calgary.ca/transportatio...-projects.html,
https://www.calgary.ca/content/dam/w...all-design.pdf). They finished all the widening of Glenmore itself, rebuilt the noise barrier at WB Glenmore to NB Crowchild, built the new pedestrian bridge at 54th Ave; for some reason the only thing that was planned as part of the project and DIDN'T get done was the double-turn from EB Glenmore to NB Crowchild and two straight-through lanes.