View Single Post
Old 09-30-2020, 07:04 AM   #3698
TorqueDog
Franchise Player
 
TorqueDog's Avatar
 
Join Date: Jul 2010
Location: Calgary - Centre West
Exp:
Default

Quote:
Originally Posted by Ducay View Post
I almost feel like reducing it from 80kmph is a bigger deal than, say, 90 to 80/70.

I can guarantee this option to allow weaves was considered in the design phase and rejected for a reason. Boggles the mind we paid for all that material and labour for it to be destroyed days later.
I drove SB Sarcee to EB Glenmore to Crowchild yesterday and saw someone go all the way across from the EB Glenmore ramp to the 37 St exit ramp. We were only going 60 because of the construction speed limit and it STILL looked like it's going to be a complete and total mess to allow that weaving.

This is just bad. They should have designed a way to get to 37 St using the existing flyover without having to weave across like six lanes of traffic.
__________________
-James
GO
FLAMES GO.

Quote:
Originally Posted by Azure
Typical dumb take.
TorqueDog is offline   Reply With Quote