View Single Post
Old 09-10-2020, 12:01 PM   #3575
lazypucker
First Line Centre
 
lazypucker's Avatar
 
Join Date: May 2004
Exp:
Default

Quote:
Originally Posted by Mazrim View Post
Is it really a whole bunch more? They pre-graded the widening when they built the road, so all they have to do is scrape off the topsoil and put down the asphalt. They'll have to move some small signs around and revise the big green ones, but otherwise everything else should be good to go. I'd love to know why they haven't done it in the NE area yet.
How much does it cost to build another bridge to add more lanes on the portion by Bowness Park?
lazypucker is offline   Reply With Quote