Quote:
Originally Posted by lazypucker
They often underbuilt roads and have to spend a whole bunch more money later to expand it. The 3 to 2 to 3 lane Stoney at various sections is just mind boggling. I don't understand the logic.
|
Is it really a whole bunch more? They pre-graded the widening when they built the road, so all they have to do is scrape off the topsoil and put down the asphalt. They'll have to move some small signs around and revise the big green ones, but otherwise everything else should be good to go. I'd love to know why they haven't done it in the NE area yet.