Quote:
Originally Posted by Acey View Post
It's not a P3 project so there's no hard date set. There's some nonsense going on around Lower Springbank Road with the relocation of a powerline. The "promise" right now is 2024. The new bridge over the river north of COP and the rebuild out to Old Banff Coach Road all that should be done in 2022.
Thank you. Do you have a link to the source of this "promise"?
Also, 2024 is a year. Is a completion month noted anywhere?

As for the P3 reference, to my knowledge AT has hard drop-dead opening dates with each one of the big GC's for the RR sections (EllisDon etc.). Missing those dates carry huge penalties for the GC's. Which makes me think that these completion dates should be public knowledge, no?
__________________
"An idea is always a generalization, and generalization is a property of thinking. To generalize means to think." Georg Hegel
“To generalize is to be an idiot.” William Blake

Last edited by CaptainYooh; 08-27-2020 at 04:24 PM.
CaptainYooh is offline   Reply With Quote