I'm assuming they're going to partially open the interchanges at Sheriff King and Spruce Meadows. It looks like they're almost ready to pave the ramps to the bridges. However, I'm not sure how the funding is working this time around. I think that with the SE section they had to open it all at the same time because of the contract.
|