Quote:
Originally Posted by You Need a Thneed
The Bolt I have can only charge at 50 kW, the charging station there is capable of charging at 350 kW.
At that charging rate, it would charge to 80% from zero in less than 10 minutes.
Level 3 charging (Even at 50 kW) is far beyond what your residential electrical service is capable of providing. But there are people that have level 2 chargers for other people to use.
|
Doesn't level 3 charging just require a 220V outlet?
Seems to me that should be made standard in all housing construction. It isn't that hard to do.