View Single Post
Old 06-01-2020, 02:29 PM   #3298
Acey
Franchise Player
 
Join Date: Nov 2009
Location: Calgary
Exp:
Default

Quote:
Originally Posted by Old Yeller View Post
Are they just arbitrarily assigning 50 metres as a measurement for something they saw from a mock up or what are they basing their "expectations" on.
They are correct in the highway being closer than the very first set of plans. The Anderson Rd interchange has changed from what were the somewhat long-standing conceptual plans: a new EB-NB loop ramp has been added which pushes the NB-EB ramp from Stoney to Anderson outward and closer to Woodbine. Quantifying this distance at 50 metres is arbitrary but the plan did change, presumably because modelling showed higher utilization of the EB-NB movement because of that Costco or something.

2009 plan here
Current plan/build here
Acey is online now   Reply With Quote