The difference in this case is that the Green Line was popular at the beginning; it's just only after the budget overruns that led to the severe cutting of the line in 2017 and now the change from a full tunnel through the core to partial shallow tunnels, bridge and surfacing running on Centre Street did opposition appear.
If the Green Line still looked like this (or even somewhat close to it), there wouldn't be any problems.