Quote:
Originally Posted by lazypucker
When it was said that the construction will complete by fall 2021 does it mean only the SW portion (22X to Glenmore), but not including the Glenmore to 16 Ave part?
|
Correct. The remaining portion to connect Highway 8 to Highway 1 is supposed to be open in 2022.
__________________
Turn up the good, turn down the suck!
|