Quote:
Originally Posted by sureLoss
More details on cost overruns:
https://calgaryherald.com/news/local...box=1564167208
- Overruns on the event centre will be split 50/50
- If a overrun is caused by one party's request, then that overrun is 100% on that party (e.g. if Flames want gold plated fixtures in the luxury boxes, the Flames will have to pay for them)
- The 3000-5000 seat community rink will only be delivered if it can be fit within the $275 million contribution
- CSEC's contribution to the Saddledome demolition is capped at $1.5 million regardless of what the final cost ends up being
|
So basically it will be downgraded to a glorified community rink, ala Edmonton.