Quote:
Originally Posted by getbak
The secondary facility will be built if it can be constructed as part of the total $550 million budget for the whole facility. It will presumably serve as both the practice rink for the Flames and Hitmen as well as a replacement for the Corral and the events held in there (assuming it will be built with a similar capacity to the Corral).
|
this is the only part that's kind of sucks for you guys, I think. that they didn't guarantee the secondary facility.
what are the odds the project is far enough under budget to be able to build the secondary rink?