Quote:
Originally Posted by GioforPM
Well for one thing, it's right near the river. And in a flood zone.
|
The Green Line is literally going UNDER the river.
It’s something to take into account, not a deal breaker.
But, it would be a LOT more money, and likely would mean that the south line wouldn’t be connected to the rest of the LRT system for at least a year (almost certainly more), and have no Erlton or Stampede stations for that time frame.
Either the Big 4 (permanently) or Macleod Trail (during construction) would have to be out of service.