One of the biggest issues is that the 4.6B estimate was for a fully at-grade LRT system.

The City of Calgary presented their ludicrously biased community engagement regarding whether we wanted at-grade, elevated or tunneled without presenting the trade-offs (pretty standard for City of Calgary - only present trade-offs if they want the consultation to fail - like for the crosswalk at the Peace bridge).

One of the trade-offs of selecting the most expensive method (albeit the best from a technical perspective) is that you would run out of money for the full line. Pretty sure this was already a certainty once the decision to tunnel was made.

I would've been interested to see the consultation results if it was presented that if we do at-grade, we can complete the entire Green Line as planned, but the tunneled would lead to this staged approach we're seeing today.
Regorium is offline   Reply With Quote
The Following User Says Thank You to Regorium For This Useful Post: