Quote:
Originally Posted by 81MC
Whoever engineered 9th ave for the new BRT line has very clearly never ever ever driven that section of road. Ever.
Added a light. Reduced to formally one through lane under the CP bridge. Right lanes must turn right, onto almost unused routes. And no advanced arrows.
Well done. Such a wonderful transit development has managed to make traffic flow worse, all the way through forest lawn and into Main Street Inglewood. So impressed.
|
And all this for 2 buses, that half the time cross the entire length of the transitway in tandem.
CT is just so frustrating. The published schedules for the 1 and the MAX state there should be a bus passing by the 9th Ave Station every 6 minutes in morning rush. In February, of the 9 or 10 days I took the bus, at least 6 times the 1 and Max arrived simultaneously. It has to be the worst run transit authority in Canada. I can’t decide if they are just spectacularly, woefully incompetent, or just couldn’t give a flying F about anything. Just mind boggling.