Quote:
Originally Posted by getbak
The Vancouver games had a 13% cost overrun. As far as I can tell, their budget didn't include any contingencies for cost overruns.
The Calgary 2026 bid plan includes 25% of contingencies. If the Vancouver budget had included similar contingencies, it would have come in 9.5% under budget.
|
Is that the budget that Hostco was given or the budget at the time of plebiscite. Is that the Opex or Capex or both?