View Single Post
Old 09-11-2018, 12:01 PM   #534
shermanator
Franchise Player
 
shermanator's Avatar
 
Join Date: Apr 2007
Exp:
Default

There's a little snippet on stadium progress in the Calgary Herald in a Spruce Meadows article:

Quote:
Attention will now turn to renovations on existing Spruce Meadows facilities in preparation for Cavalry FC’s 2019 season. Allison said many modifications have already been made over the summer, with the bigger stadium installations scheduled to take place over the fall and winter.

“We’re excited about Cavalry FC getting up and running and we’ve done a lot of our pitch renovations to the meadows on the green stadium,” said Allison. “We’re going to be having a Cavalry FC and Edmonton FC prospect game at the end of September just to test the pitch and give our members a sense of what they can look forward to when we launch in 2019.”

The soccer season will run from April until October, which will overlap with some international show jumping. Allison said the stadium will continue to be dedicated to equestrian events, with away games scheduled when the two sports overlap.
Link: https://calgaryherald.com/news/local...spruce-meadows
__________________

shermanator is offline   Reply With Quote
The Following 2 Users Say Thank You to shermanator For This Useful Post: