Quote:
Originally Posted by Johnny Makarov
and instead of using Chinese slave labour this time we'll opt for North Koreans.
A bullet train from here to Vancouver would probably cost a trillion dollars to build. those darn mountains
|
Lol, by day I meant 24 hrs, I think the best a passenger train could do would be in that range.
Wasn't thinking bullet train at all, there are already tracks and a designated passenger train could make a non stop run to Vancouver and up to Whistler fairly easily. It would be a short time period to run during the olympics and the rail should be able to slot it in with the cargo trains that are normally running.