But what's with the LIES?
Rotating closures for line painting in P2, yet they are very clearly NOT doing line painting. The structure is only a year old, plus it's been shutdown for months at a time.
North elevators still shutdown due to "water main break". How long has it been? 6 months? Clearly something else.
Then a random sign on the pedway apologizing for the inconvenience due to replacing light fixtures. The dang airport is a year old! What needs replacing.
|