Quote:
Originally Posted by CaptainCrunch
Its a win but not a win.
It allows us to ship bitumen through the pipeline at our normal volume. But construction is still on a hold for this court challenge.
Basically because the Feds didn't tell them that they could cram going to the courts. BC came out on top of the Feds but blinked against Alberta slightly.
|
I think that we should still be taking action. If the pipeline is still on hold because they have only sort of pulled back, we should continue the pressure.