I dare say, it looks like a garage now! Big push this weekend, put the window in Thursday night. That was a pain because the Rona guy decided I didn't want a flange, so a 20 minute job turned into a 2 hour job. Friday I prepped the roof by installing drip edge and eave protection membrane.
Saturday 4 of us worked a full day in the sweltering heat to get the shingles on. Holy hell there is a job I'd never want. Yesterday I put the big door in. For some reason they included an entire extra door panel, it looks like it was on the bottom of the stack as protection or something, as it is damaged and incomplete...so I've got this 18 foot section of garbage to get rid of. Thanks again, Rona! The door isn't operational yet, as I got to the last couple steps of the instructions where it says "install with lag bolts, not included". Thanks guys! So I should get that done today.
I'll be taking a break for a few weeks, then need to form up the concrete apron, sidewalk and a few steps, and pour those. Then get some asphalt in to finish the driveway. Outside I'd like to get the soffits and drip edge installed before winter. I think siding will wait until spring. Inside I need to run all the internal electrical, lighting and install the garage motor. She will finally be ready to receive a car. I'm guessing early to mid November, hopefully before I need to put winter tires on so I can do it for the first time in a dry garage! Insulation and drywall may happen over the winter, we will see.