Quote:
Originally Posted by aaronck
Thanks for the replies! I'll let him know to check insurance, but looks like he's probably on the hook for the $$. What a bummer thing to happen-
|
Once the line is excavated, have him get someone to confirm that the initial install was done according to code and the proper materials were used. If the city inspection allowed something to get through that shouldn't have, he could try to get the cost back from the city. Unlike a home inspector, I'm pretty sure a city inspector is liable for their inspections.