Just did master bath
1) Rip it all out at once, floor, walls, etc
2) Shut water off and redo plumbing and add shutoffs where appliable (under sink, potentially one for shower lines if you have access to back side of shower wall). PLumb in new shower fixture/mixer. You shouldn't need a plumbing consultation as long as you know your plans and what needs to go where (location, heights, etc).
3) Replace drywall and cement board
4) WATERPROOF - cement board is not waterproofing. Either paint on redguard, or apply Kerdi membrane.
5) Tile shower walls
6) Ditra (or similar membrane) on floor, bonus points for in floor heating
7) Reinstall vanity, etc.
|