Quote:
Originally Posted by V
I just put in a driveway on my front lawn with a 3" layer of 3/4" road crush. I'm thinking of topping that off with a couple inches of washed rock so that it stays relatively clean even in the rain, but I'm not sure this is necessary. I'm also not sure if I should wait for everything to settle a bit before I add. Also don't know what size of washed rock I should use.
Any thoughts?
|
Did you use a tamper? That's where I'd start. Ideally would have tampered the prepped area before spreading the road crush, then tamper the crush and live with it for the spring through a few rain storms and see how it is before buying a load of washed and labouring to spread it.